2019 DOT Holiday Construction Embargo

    https://www.milrose.com/insights/dot-holiday-construction-embargo
    A special Holiday Construction Embargo will commence on Friday, November 15, 2019, and run through Thursday, January 2, 2020, from 6:00 a.m. to 11:59 p.m. Roadway and sidewalk construction activities will be restricted during the embargo period on selected streets. For information on which streets fall under the embargo, please reference the Department of Transportation (DOT) website.

NYC DOT's Holiday Construction Embargo - Sullivan ...

    https://sullivanengineeringllc.com/2019/10/31/nyc-dots-holiday-construction-embargo/
    Oct 31, 2019 · Aside from the ice and snow, a significant seasonal restriction to be aware of is the New York City Department ofTransportation’s “Holiday Construction Embargo.” This regulation limits and often prohibits work from taking place in the …

NYC DOT - Construction Embargoes

    http://home.nyc.gov/html/dot/html/infrastructure/construction-embargoes.shtml
    DOT imposes construction embargoes during significant special events, including the New York City Marathon, parades, and for the winter holiday season. During embargoes, all active permits in the affected area(s) are suspended and no new permits may be approved, unless a waiver for the work is granted by DOT. Read more about embargoes in the Street Works Manual. No Dig Special …

REQUEST FOR ROADWAY/SIDEWALK PERMITS DURING …

    http://www.nyc.gov/html/dot/downloads/pdf/holidayembapp.pdf
    DURING EMBARGO PERIODS (Official Use Only) Permit Number (Official Use Only) Start/End Date (Today's date): / / * This form is required for all requests to allow work in embargo areas during embargo times. Permit Type: 0169 * See reverse for instructions on how to complete this form. SECTION A: Applicant Information 2.

2017 DOT Holiday Construction Embargo

    https://www.milrose.com/insights/2017-dot-holiday-construction-embargo
    2017 DOT Holiday Construction Embargo. Sep 26, 2017. A special Holiday Construction Embargo will commence on Wednesday November 15, 2017, from 6:00 a.m. through Tuesday, January 2, 2018, 11:59 p.m. Roadway and sidewalk construction activities will be restricted during the embargo period on selected streets. For information on which streets fall under the embargo, please reference the …

3.6.2 Embargoes Street Works Manual

    http://streetworksmanual.nyc/chapter-three/embargoes
    For all permit applications including permit requests to work on embargoed streets through the HE period, the permittee will be automatically charged an additional $135 HE application review fee. Details about the exact holiday embargo dates, times, and locations are posted on NYC DOT…

Permitspace: DOT Permit Holiday Embargo

    https://permitspace.blogspot.com/2007/11/department-of-transportation-permit.html
    Nov 01, 2007 · Refer to the Attachment for Streets affected by the DOT Holiday Embargo : "2007 Holiday Construction Embargo - This embargo applies to NYCDOT Construction Permits. A special construction embargo is in effect Friday, November 16, 2007 from 6AM to 11:59 PM and from Tuesday, November 20, 2007 6AM through Wednesday, January 2, 2008 11:59PM for the 2007 Holiday Construction Embargo.

2007 Holiday Construction Embargo

    http://jamesanzalone.com/Permitspace/DOTHolidayEmbargo.pdf
    during the upcoming holiday season on the roadways listed below. Any permits issued prior to the date of this notice for work in the areas listed for the Holiday Embargo which do not already have the Embargo Waiver traffic stipulation “410” are hereby voided for the period of Friday November 16, 2007 from 6AM to 11:59

Streets subject to the conditions of the Holiday ...

    http://www.nycgovparks.org/pagefiles/78/2014-holiday-construction-embargo-locations.pdf
    On all holiday season gridlock alert days during the Holiday Construction Embargo period lane closures are prohibited from 6:00 AM to midnight on highways (and their service roads) and East and Harlem River Bridge Crossings listed below. (Work behind permanent barrier, not impacting on vehicular, bicycle or pedestrian traffic flow may continue).