Dcra Permit No Work Holidays



Searching for Dcra Permit No Work Holidays information? Below are the most relevant links to Dcra Permit No Work Holidays info.

No Construction Allowed Holidays dcra

    https://dcra.dc.gov/page/no-construction-allowed-holidays
    Dec 25, 2019 · No Construction Allowed Holidays Construction is not permitted on federal and District Government holidays. On the following holidays, all construction work, for which a permit is required, is illegal and could result in a Stop Work Order and may be subject to fines. For more information, visit our illegal construction webpage.

Report Illegal Construction dcra

    https://dcra.dc.gov/service/report-illegal-construction
    Work without a permit; Work outside the scope of a permit; Work before 7am or after 7pm Monday through Saturday or any time on Sunday, and on holidays. If you break these laws again, you may be fined up to $4,000 per infraction. DCRA will not release the Stop Work Order until you pay the permit fee. Stop Work Order Appeal Process

Modified Holiday Schedule for Select District Services for ...

    https://mayor.dc.gov/release/modified-holiday-schedule-select-district-services-presidents-day
    Feb 13, 2020 · Construction is not permitted on federal and District Government holidays and could result in a Stop Work Order and may be subject to fines. Construction performed with an active afterhours work permit is allowed. DCRA is closed and construction is also prohibited on these 2020 holidays.

GUIDELINES FOR After Hours Permit

    https://eservices.dcra.dc.gov/DocumentManagementSystem/Home/retrieve?id=Guidelines%20For%20After%20Hours%20Permit.pdf
    In accordance with section 105.1.3, no after-hours permit shall be issued for work in an area zoned "Residential" under the zoning regulations in effect at that time, in an area within 500 feetFile Size: 246KB

Holiday Schedules dchr

    https://dchr.dc.gov/page/holiday-schedules
    Office Hours Monday to Friday, 8 am to 5 pm Connect With Us 1015 Half Street, SE, 9th Floor, Washington, DC 20003 Phone: (202) 442-9700 Fax: (202) 727-0154

Hot Work Permits Requirements fems

    https://fems.dc.gov/publication/hot-work-permits-requirements
    Mar 22, 2013 · Monday to Friday, 8:15 am to 4:45 pm, except District holidays Connect With Us 2000 14th Street, NW, 5th Floor, Washington, DC 20009 Phone: (202) 673-3320 Fax: (202) 462-0807 TTY: 711 Alternate Number: Media Hotline: (202) 579-6905 Email: [email protected]

DCRA Data Connect - Permits

    https://eservices.dcra.dc.gov/DCRADataConnect/Home/Permits
    Jul 24, 2020 · Need help with this application? Please contact us at 202-442-4400 if you have any other concerns or issues.

Conditions of Public Space Permits ddot

    https://ddot.dc.gov/page/conditions-public-space-permits
    DC Law 3129, Underground Facilities Protection Act of 1980, requires contacting the "Miss Utility" at (800) 257-7777 at least 48-hours and not more that 10 days (excluding Saturdays, Sundays and Legal Holidays) prior to start of excavation. This is required so notification can be made to participating private utility companies of the proposed work.

Permits & Design Review op - DC Office of Planning

    https://planning.dc.gov/page/permits-design-review
    The District of Columbia's historic preservation law is intended to ensure that work done on historic properties is compatible with their historic character. This is accomplished through a design review of building permits and subdivision applications. Please Note: Changes in the permitting process through the Department of Consumer and Regulatory Affairs (DCRA) and Department of ...

rui_header dcra

    https://acaprod9.dcra.dc.gov/CitizenAccess/Default.aspx
    The District of Columbia. dc . Residents; Business; Government; Visitors; Education; Jobs

Leave a reply